Kapa Oil Refineries Ltd 2,500 kWp Grid Tied Solar System

Kapa Oil Refineries Ltd 2,500 kWp Grid Tied Solar System

 

Our flagship project Kapa Oil Phase 1

The FIRST private installation in Kenya to cross 1 MW.

The roof-top mounting system was completed using aluminum rails for a light weight structure.
The system was fitted with a non-reverse meter to prevent feedback to the grid, as well as a real
time, remote monitoring system to enable both the client team and CP Solar to monitor system
performance from anywhere in the world.

The FIRST private installation in Kenya to cross 1 MW.

Total Solar PV Capacity: 2.5 MWp
Location: Nairobi, Kenya

Phase 1 PV Capacity: 1.5 MWp
Phase 1 Commissioning: June 2019
Breakeven Period Phase 1: 3.0 years
Solar Panels: SunPower
Inverters: SMA

Phase 2 PV Capacity: 1.0 MWp
Phase 2 Commissioning: December 2021
Breakeven Period Phase 2: 3.5 years
Solar Panels: SunPower
Inverters: SMA
Fuel Save Controller: SMA

Enquire Now

Quick Enquiry




    Product Interested In

    Solar Solutions: Business

    Solar Products

    What finance options are you interested in? Select all that apply

    How soon do you want to invest in Solar energy?

    Anything else we should know?

    I agree to receive marketing emails from CP Solar Resources Limited

    Kindly note that these email include but are not limited to newsletters, promotional offers and announcements from CP Solar Resources Limited. Each email you receive from us provides a one-click method to unsubscribe from the distribution list.

    Privacy Policy.

    Reduce your Power
    Costs with CP Solar!

    Enquire Now
    Cookie Settings